Energence Power

Powering the AI era, Sustainably.

Next-gen energy sites for hyperscale data centers.

CARBON-FREE HYPERSCALE-READY GRID-INDEPENDENT TIMELINE-DRIVEN INTERCONNECTION-AWARE SITE-FIRST

The grid wasn’t built

for the AI era.

2020 2025 2030 AI Demand Grid Capacity The gap

2

X
DC energy demand by 2030

165

TWh
Hyperscale data center consumption (US, 2023)

5/7

yr
Avg lead time for grid interconnection

Three things.

Done well.

03 How we work
Three deliverables. Three milestones.
DELIVERABLE 01/ Site Dossier

From terrain
to thesis.

Before a single panel is specified, we hand the client a full site dossier — every parcel screened against the criteria that actually predict an energizable site.

Land & grid Feasibility Risk-scored
REPORT · site dossier
EP-2025-NJ-014
  • Grid proximity
  • Land use
  • Fiber access
  • Water rights
  • Interconnection queue
  • Community signal
0
Criteria
evaluated
0
Days to
deliver
0:1
Sites screened
to shortlist
Ready · Q2 2026
DELIVERABLE 02/ Shovel-Ready

Permits
stitched tight.

Every layer of permitting, every utility handshake, every EPC framework signed. The package the client receives is a sandbox ready for shovels, not a wish list.

Permitting Interconnect EPC ready
PACKAGE · shovel-ready
EP-2025-NJ-014 / SR
  • Environmental reviewStamped
  • Zoning & entitlementsStamped
  • InterconnectionStamped
  • EPC frameworkSigned
  • PPA structuredSigned
0
Months to
shovel-ready
0
Utilities
engaged
0%
First-pass
approval
Shovel-ready · Q3 2027
DELIVERABLE 03/ Energized

Megawatts
that show up.

From substation handshake to first megawatt-hour: a commissioned, 24/7 carbon-free site that delivers on the timeline AI demands — and keeps delivering after.

Commissioned 24/7 CFE Long-term PPA
STATUS · energized site
EP-2025-NJ-014 / LIVE
First-phase capacity
0MW
0 MW LIVE 15 MW
0/7
Carbon-free
matching
0yr
PPA
contract
0%
Hyperscale
grade SLA
Energized · Q4 2028
01Site dossier 02Shovel-ready 03Energized

Energy is no longer a utility question.

It's an infrastructure question.

It's a timeline question.

It's a climate question.

We answer all three at once

by developing carbon-free energy sites at the speed AI actually moves.